Skip to main content
SteelCity

Our Projects

Strong Foundations, Finished Landmarks

Home Projects

Case Studies

What Each Build Proved

Commercial · 2025

Meridian Commercial Tower

A 14-storey frame erected through one wet winter. We sequenced steel deliveries at night, kept the deck two floors ahead of the pour, and handed over three weeks early.

Duration
19 months
Steel erected
2,300 t

Residential · 2025

Harbourview Apartments

96 units across two blocks with residents moving into block A while we finished block B. Phased handovers, separate access routes, and not one noise complaint upheld.

Duration
22 months
Snag rate
0.4 / unit

Industrial · 2024

Ironclad Steel Foundations

A 4,200 m³ continuous pour on ground everyone else wanted to pile. Our soil redesign saved the client six figures — and the slab tested 15% over spec.

Pour window
36 hours
Strength
115% spec

Industrial · 2024

Northgate Logistics Hub

38,000 sq ft of warehouse with 12 dock levellers and a 40 m clear span. Night-shift steelwork kept the neighbouring depot running throughout.

Duration
11 months
Clear span
40 m

Residential · 2023

Sunrise Housing Estate

42 family homes from bare field to front lawns, including roads, drainage, and a play park. Every plot sold before the final roof went on.

Duration
26 months
Homes
42

Commercial · 2023

Foundry Row Workshops

Twelve light-industrial units with three-phase power, gantry rails, and mezzanines — designed so a one-person startup or a 30-strong firm fits equally well.

Duration
14 months
Let within
60 days

Sign Up For News & Get All Updates

Contact with us (405) 555-0128